Engineering Tomorrow’s Mobility with Purpose and Technical Excellence
Capabilities
Our core capability lies in delivering consulting services and solutions that span the entire transportation infrastructure lifecycle — from vision and planning to execution and operation. We bring deep technical expertise, domain insight, and purpose-driven thinking to every phase, enabling our clients to make informed decisions, optimize resources, and achieve lasting impact. Whether it is shaping strategies, guiding execution, or enhancing long-term asset performance, Translink ensures that infrastructure is not just built — it is built to transform mobility and empower growth.
1. Planning
We turn mobility visions into actionable strategies by combining technical depth with forward-thinking insights. Our planning approach integrates data, policy, and stakeholder priorities to define a clear roadmap for project success. This is where we lay the foundation for infrastructure that is future-ready, sustainable, and transformative.
2. Design & Preparation
At this stage, we translate strategy into design and structure, ensuring every decision is technically sound and financially robust. Our work empowers clients with clarity and confidence before execution begins — minimizing risks, optimizing resources, and setting the stage for seamless delivery.
3. Construction
Advisory
We act as the client’s trusted partner on the ground, safeguarding quality, timelines, and safety at every step. Through meticulous supervision, proactive decision-making, and technical oversight, we ensure that the project’s execution truly reflects the intent of its design and delivers enduring value.
4. Operation & Advisory
Our role extends beyond commissioning — we help assets perform, evolve, and deliver value throughout their lifecycle. Through advisory, due diligence, and strategic asset management, we enable informed decisions, unlock investment potential, and enhance the long-term sustainability of infrastructure.
The Translink
Way
At the heart of The Translink Way is our commitment to navigating the complexities of transportation infrastructure with clarity, purpose, and precision. Our approach is built on three foundational pillars — Innovative Thinking, Impeccable Judgment, and Exhaustive Research — which together enable us to craft solutions that are future-ready, deeply impactful, and technically robust. These principles guide every engagement we undertake, ensuring that our work not only addresses today’s challenges but also anticipates the opportunities and mobility needs of tomorrow.
Innovative Thinking
We challenge conventional methods and reimagine mobility challenges through inventive, systems-driven thinking.
By integrating emerging technologies, data-led insights, and forward-looking design principles, we deliver solutions that go beyond the expected — solutions that anticipate change, adapt to evolving needs, and transform how infrastructure serves people and economies.
Impeccable Judgement
Our decades of multidisciplinary expertise empower us to make decisions with clarity, confidence, and purpose, even in the most complex and dynamic project environments.
We combine technical precision with strategic foresight, helping clients navigate risks, capture opportunities, and make informed choices that deliver long-term impact and resilience.
Exhaustive Research
Every recommendation we make is grounded in meticulous analysis, contextual understanding, and data-backed insight.
We explore every variable — from engineering detail to user behavior — to ensure our solutions are not only technically sound but also purposeful, scalable, and sustainable. This depth of research reduces uncertainty and builds confidence into every stage of the project lifecycle.
Exemplary Expertise
Unlocking Potential
1.3 Billion USD and Beyond with Advisory Excellence
delivered
design experience
pavement evaluation
(including highways & high-speed rail)
PMC experience
road safety audits
Manufacturing clusters
Over the past 15 years, Translink has shaped more than 15,000 km of transportation infrastructure, delivered advisory for projects worth over ₹50,000 Cr, and enabled transformative improvements in mobility, safety, and regional development across India. Every project we deliver is not just an engineering assignment — it is an instrument of long-term impact.
Highways
Gandhidham–Mundra Section, NH41, Gujarat
Scope of Work :
Detail Project Report
Corridor Length & Configuration
71.4 km & 6 lane
Estimated Project Cost (Cr)
1617
Client & Authority
National Highways Authority of India
Project Overview
The Gandhidham–Mundra section of National Highway 41, approximately 71 km in length, forms a critical logistics link between the industrial hub of Gandhidham and Mundra Port, one of India’s largest maritime gateways. The corridor facilitates major freight movement supporting the western logistics ecosystem and port-based industries in the Kutch region. Translink was appointed by NHAI to prepare the Detailed Project Report (DPR) for the six-laning of this corridor. The assignment included alignment finalization, geometric and pavement design, cost estimation, and preparation of bid documents for implementation under HAM mode.
Impact
Upon implementation, the upgraded corridor will substantially enhance freight efficiency and reduce travel time between Gandhidham, Mundra, and hinterland industrial nodes. It will improve safety and connectivity for port-linked logistics, support regional economic development, and reduce emissions through smoother traffic flow. As the DPR is under approval, these benefits will be realized upon construction and commissioning of the project.
Bridges and Structures
Major Bridge on Gambhir Nallah, Jammu
Scope of Work :
Detail Project Report
Corridor Length
138 m
Project Investment (Cr)
20
Span Arrangement
3 29.3
Superstructure
Steel Composite Girder
Substructure
RCC Circular Pier
Foundation
Open
Client & Authority
PWD (R&B) Division, Udhampur
Project Overview
Majalta region had only seasonal connectivity across Gambhir Nallah, with road access interrupted during monsoon flows, affecting daily mobility, emergency access, and movement of goods. To establish a reliable, all-weather link, a motorable bridge was planned on the Majalta Link Road. Translink Infrastructure Consultants Pvt. Ltd. was appointed to carry out the detail design of the bridge.
Impact
The bridge enables year-round vehicular movement on the Majalta route, improving accessibility for local communities and regional services. The structural design and foundation detailing enhance durability and resilience in a challenging topographic and hydrological setting. The solution balances constructability, long-term performance, and safety in a valley environment, supporting reliable connectivity and reduced travel interruptions.
Pavement Engineering
Full Depth Reclamation based road upgradation in Uttar Pradesh
Scope of Work :
DPR/ AE /IE /PMC
Corridor Length & Configuration
5000 km
Estimated Project Cost (Cr)
5000
Client
Uttar Pradesh Rural Road Development Agency
Project Overview
The road upgradation programme in Uttar Pradesh was undertaken to rehabilitate existing rural and district roads while addressing the region’s aggregate scarcity and reducing material haulage costs. Full Depth Reclamation (FDR) was adopted to reuse in-situ pavement layers through stabilization, improving structural capacity without dependence on new aggregates. Translink Infrastructure Consultants Pvt. Ltd. served as the Project Management Unit (PMU), responsible for DPR preparation, job-mix design validation, construction supervision support, digital monitoring, and capacity-building to standardize FDR implementation across multiple districts.
Impact
The FDR program delivered cost-efficient pavement rehabilitation while reducing the demand for virgin aggregates and minimizing haulage requirements. The approach improved structural strength, riding quality, and pavement life with lower lifecycle maintenance needs. The programme also enabled the state to develop in-house expertise in sustainable pavement rehabilitation, positioning FDR as a repeatable, scalable solution for future road network upgrades.
Aviation
Rajiv Gandhi International Airport, Hyderabad
Scope of Work :
Airside Pavement Assessment
Project Area (Sqmt.)
12.5 Lakh
Client
GMR Hyderabad Internatinal Airport Limited
Project Overview
Rajiv Gandhi International Airport (RGIA), Hyderabad, required a comprehensive Pavement Condition Rating (PCR) evaluation of approximately 12.5 lakh sq.m of runways, taxiways, and aprons to comply with DGCA latest pavement performance reporting requirements. Translink Infrastructure Consultants Pvt. Ltd. was appointed for PCR evaluation of airside pavements using available Heavy Weight Deflectometer (HWD) data and performance indicators.
Impact
The assignment enabled timely DGCA-compliant PCR submission, helping the airport establish a clear baseline for pavement performance.
Railway
Final location survey for doubling of railway line between Panipat - Rohtak section
Scope of Work :
Final Location Survey
Corridor Length & Configuration
71.4
Project Investment (Cr)
714
No. of Toll Plazas
2
Client & Authority
NHAI
Status
Completed
Summary
As part of the four-laning of the Gadu–Porbandar corridor, Translink provided detailed engineering design for a 93.5 km coastal highway. Our solutions optimized alignment geometry, pavement design, and safety features while ensuring constructability and cost efficiency.
Impact
The project strengthens regional trade routes, reduces travel time by nearly 30%, and improves socio-economic connectivity across the Saurashtra coastline.
Highway
Gandhidham–Mundra Section, NH41, Gujarat
Scope of Work :
Detail Project Report
Corridor Length & Configuration
71.4 km & 6 lane
Estimated Project Cost (Cr)
1617
Client & Authority
National Highways Authority of India
Summary
The Gandhidham–Mundra section of National Highway 41, approximately 71 km in length, forms a critical logistics link between the industrial hub of Gandhidham and Mundra Port, one of India’s largest maritime gateways. The corridor facilitates major freight movement supporting the western logistics ecosystem and port-based industries in the Kutch region. Translink was appointed by NHAI to prepare the Detailed Project Report (DPR) for the six-laning of this corridor. The assignment included alignment finalization, geometric and pavement design, cost estimation, and preparation of bid documents for implementation under HAM mode.
Impact
Upon implementation, the upgraded corridor will substantially enhance freight efficiency and reduce travel time between Gandhidham, Mundra, and hinterland industrial nodes. It will improve safety and connectivity for port-linked logistics, support regional economic development, and reduce emissions through smoother traffic flow. As the DPR is under approval, these benefits will be realized upon construction and commissioning of the project.
Voice Of Trust
The planning and execution of the design project for Katni-Umaria section was unprecedented in terms of detailing and professionalism. Not to wonder why our total execution cost was significantly below our internal estimates. Thanks Translink!
Manoj Vekaria
Partner,
Kalathia Engineering and Construction Ltd.
Your team actively listened & understood our unique requirements for Chennai Monorail project. We did not believe that ridership estimation can be finished in such quick time but your team improvised readily and proved us wrong. Thanks for the support.
Ravi Praveen
Sr. Traffic Engineer,
IL & FS
Pre Bid Engineering services your company provides is top quality from initial request for info and proposal to the execution of the activity and de-brief. Your uncompromised data and reports have helped us in taking informed decisions and win many projects.
Rajesh Neelakantan
CEM,
Larsen & Toubro
Voice Of Trust
The planning and execution of the design project for Katni-Umaria section was unprecedented in terms of detailing and professionalism. Not to wonder why our total execution cost was significantly below our internal estimates. Thanks Translink!
Manoj Vekaria
Partner,
Kalathia Engineering and Construction Ltd.
Pre Bid Engineering services your company provides is top quality from initial request for info and proposal to the execution of the activity and de-brief. Your uncompromised data and reports have helped us in taking informed decisions and win many projects.
Rajesh Neelakantan
CEM,
Larsen & Toubro
Your team actively listened & understood our unique requirements for Chennai Monorail project. We did not believe that ridership estimation can be finished in such quick time but your team improvised readily and proved us wrong. Thanks for the support.
Ravi Praveen
Sr. Traffic Engineer,
IL & FS
Perspectives









Safer Journeys by Design: A Case Study from the Hapachara–Tulungia Corridor
Every highway tells a story — of movement, opportunity, and progress. But some corridors also carry stories of conflict, near-misses, unsafe crossings, and unpredictable patterns that put lives at risk.
Celebrating 15 Years of Translink: A Journey of Grace, Gratitude & Glee
Translink Infrastructure Consultants Pvt. Ltd. recently celebrated a significant milestone — 15 years of engineering excellence, organisational growth, and human transformation. The evening brought together our leadership, team members, partners, and well-wishers, creating a memorable celebration of purpose and progress.
Advancing Airport Pavement Management: Translink’s Work on PCR & PCN-to-PCR Framework
The aviation sector is entering a new era of pavement asset management—one that goes beyond traditional strength-based evaluation and moves toward performance-oriented, maintenance-focused, and lifecycle-aware methodologies. At the center of this shift lies the Pavement Classification Rating (PCR) system, an emerging approach that evaluates pavements holistically rather than relying solely on structural indices like PCN (Pavement Classification Number).
Powering India’s Largest Highway Monetization: How Translink’s Traffic Intelligence Strengthened NHIT’s ₹18,380 Crore InvIT Transaction
India’s road sector has marked a historic milestone with the largest InvIT monetization transaction ever recorded—₹18,380 crore—successfully concluded by National Highways Infra Trust (NHIT).
Advancing Sustainable Road Rehabilitation: Translink Delivers FDR Presentation at NTPC, Hazaribagh
Translink Infrastructure Consultants was invited by NTPC Hazari Bagh, Jharkhand to present our technical approach on Full Depth Reclamation (FDR)
Engineering Sustainable Pavements: Translink’s Multi-State FDR Excellence
India’s road network—one of the largest in the world—faces a persistent challenge: maintaining and upgrading aging pavements in a cost-effective, sustainable, and time-efficient manner.
Unlocking Potential: The People Strategy Behind Translink’s Culture
In most organisations, people are still viewed as “resources” — units of work to be allocated or managed. At Translink, we see people differently.
From Drawings to Decisions: Why Consulting Excellence Shapes Every Project’s Legacy
In infrastructure, every line on paper holds the potential to influence millions of lives. Yet what separates a good project from a great one isn’t only how well it is designed—but how thoughtfully it is conceived, analyzed, and executed.
Translink Receives the Pride of Gujarat Award for Consulting Excellence
Translink Infrastructure Consultants Pvt. Ltd. has been honored with the prestigious Pride of Gujarat Award in recognition of our Consulting Excellence and Innovation across Roads, Bridges, and Railways.